Nippon Koei Co., Ltd, Japan Water Agency. Topographic Survey for Preparatory Survey for Southern Chattogram Region Water Supply Project in the People's Republic of Bangladesh. Ongoing November, 2023 to March, 2024.
Pacific Consultants Co., Ltd., Japan. Hydrological observation (Water level observation & Discharge measurement) in the Sangu, Matamuhuri & Karnafuli river. Ongoing August’2022 to June.’2024.
ORIENTAL CONSULTANTS GLOBAL CO. LTD. 118.0 kms. feasibility study with detailed design for conversion of the existing MG line into DG line in Bangabandhu Bridge East-Tarakandi-Jamalpur-Dewanganj Bazar Section including construction of Tongi by pass. Ongoing August 2023 to April, 2024.
Pacific Consultants Co., Ltd., Japan. Jamuna River monsoon’2023 monitoring Survey during (Scour Characteristic Survey 120.0 km2, Flow velocity measurement by ADCP 120.0 km2, Revetment state Survey 10.0 km2, Detail Survey for Scour characteristics & Revetment state by side scan sonar & diving team, Sediment balance Survey in the 07 transect at 45 verticals 225 points, River morphological Survey 290.0 kms. Ongoing July to November 2023.
BUET Dhaka, Bangladesh. 6 nos. Bridge Hydrological Survey (Bathymetric survey, Discharge measurement & Suspended Sediment concentration estimation) in connection with Hydro-morphological Study. Completed March to May’2023.
Cox’s Bazar O&M Division, BWDB, Cox’s Bazar. 100.00 kms. Embankment X-Section & Longitudinal Profile Survey CompletedMarch’2023 to April’2023.
Elite Trading Ltd., Dilkusha, Dhaka. 21.00 kms. Bathymetric Survey in the Buriganga & Bangshi River @ 50.0m Cross Section interval in connection with MRT-6 navigation route observation. Completed February, 2023.
Pacific Consultants Co., Ltd., Japan. Bathymetry survey (Sounding) and flow velocity measurement and River bed/bank material survey in the Jamuna river at Bahadurabad, Dewangonj, Jamalpur. Completed July, 2021 to May, 2022.
Pacific Consultants Co., Ltd., Japan. 280.0 kms. UAV Drone video recording along the Left & Right bank existing river bank structure (Bank protection, Spar & Groyen etc.) of Jamuna river. Completed October to November, 2022.
Pacific Consultants Co., Ltd., Japan.
  • 380.0 kms. UAV Drone video recording along the Matamuhuri, Buri-Matamuhuri and Sangu river.
  • 180.0 kms. Polder embankment Survey along the Matamuhuri and Sangu river.
  • 52.0 kms. Supplementary Cross Section Survey in the Dalu Khal & Shikalbaha Khal and 21 nos. bridge & 3 nos. rubber dam inventory Survey work.
Completed July to August, 2022.
Strategic Planning And Management Consultants (SPMC) Ltd., Dhaka.
  • 1180.00 sq.km Spot elevation data collection @ 50m grid along the existing embankment 300m buffer and Polder interior 200m grid under 15 nos. Polder of Satkhira, Barguna, Patuakhali & Pirojpur District.
  • 868.00 kms. Embankment Cross Section, 530.00 kms. Khal Cross Section & 462 nos. Structure inventory Survey under 15 nos. Polder of Satkhira, Barguna, Patuakhali & Pirojpur District.
  • 665.00 kms. River Cross Section, 26 nos. transect in the 13 rivers transect Discharge measurement by ADCP at under 15 nos. Polder of Satkhira, Barguna, Patuakhali & Pirojpur District.
Completed October, 2021 to December, 2022.
River Research Institute, Faridpur. Bathymetric Survey, Discharge measurement by ADCP and Sediment & river bed soil sampling in the Bishkhali river in connection with Hydro-morphological study work of Betagi Bridge. Completed September, 2022.
Rajshahi O&M Division, BWDB, Rajshahi. Bathymetric Survey work in the Padma river from km. 28.000 to 44.000 = 16.000 kms. in connection with design data submission for dredging alignment fixation. Completed August, 2022.
Elite Trading Ltd., Dilkusha, Dhaka. 15.0 kms. navigation route Survey in the Buri-matamuhuri river at Moheskhali under Cox’s Bazar district. Completed June, 2022.
OTBL Dredging Ltd., Chairmanbari, Banani, Dhaka Bathymetric Survey work in the Meghna & Tentulia rivers in connection with dredging volume calculation for progress monitoring and Post work. Completed January to June, 2022.
NEM Division BWDB, Dhaka. Discharge measurement work at location of 46.9L Bahadurabad Station in the Jamuna River (From July/2021 to December/2021) under North-East Measurement Division, BWDB, 72, Green Road, Dhaka during the year 2021-2022. Completed July to December, 2021.
Nippon Koei Co. Ltd., Japan. Topographic, Inventory and Geological Survey work for detailed design of seven sub-projects in the Preparatory Survey on SCRDP. Completed July to August, 2021.
OTBL Dredging Ltd., Chairmanbari, Banani, Dhaka Bathymetric Survey work in the Meghna & Tentulia rivers in connection with dredging volume calculation & progress monitoring work. Completed January to December, 2021.
01 Mapping Cell Division, BWDB, 72, Green Road, Dhaka. Bathymetric Survey (X-Section Survey) work in the river Lower Meghna, Buriganga, Turag, Tongi, Balu, Shitolakhya, Little Feny, Sangu, Wapda Khal, Bangshi, Dakatia, Bura Gouranga, Lohalia, Matamuhuei etc. 18 nos. rivers 224 nos. X-Section in connection with routine morphological Survey work. Completed January to May, 2021.
NDE Dredging Ltd., Gulshan-2, Dhaka. Bathymetric Survey work in the Meghna & Tentulia rivers in connection with dredging volume calculation & progress monitoring work. Completed January to December, 2021.