11 River Research Institute (RRI), Faridpur. Morphological and Hydro-Biological Survey for Arial Khan river at Chandrapara, Sadarpur, Faridpur under River Research Institute (RRI), Faridpur during the year 2019-20. Completed January to June, 2020.
12 River Research Institute (RRI), Faridpur. Morphological and Hydro-Biological Survey for Kalivodra river a Kharnia Bazar & Chandgaon, Khulna under River Research Institute (RRI), Faridpur during the year 2019-20 Completed August, 2020 to June 2021.
13 Barishal O&M Division, BWDB, Barishal. Survey for Bank Protection and Dredging work of the Kirtonkhola, Joyonti, Arial Khan, Sondhya, Sugondhya, Ashokathi, Otra and Torki Branch River at different location & Khal Re-excavation under Barishal O&M Division, BWDB, Barishal during the year 2019-20. Completed April to June, 2020.
14 Bagerhat O&M Division, BWDB, Bagerhat. Pre-work survey work in 18 Nos khal Length = 52.700 km ic/w "Rehabilitation of Polder no. 36/1 in Bagerhat District (1st revised)" under Bagerhat O&M Division, BWDB, Bagerhat (Contract Package No.: RFQ-S/02). Completed March to June, 2020.
15 Bagerhat O&M Division, BWDB, Bagerhat. Pre-work & Post-work survey for Different Rivers/ Khals ic/w "Rehabilitation of Polder no. 36/1 in Bagerhat District (1st revised)" under Bagerhat O&M Division , BWDB , Bagerhat (Contract Package No.: RFQ-07/36/1/2019-20). Completed March to June, 2020.
16. PGCB, GMD-Mymensingh. Bathymetric Survey & Morphological analysis of Dhanu river under Office of the Executive Engineer, GMD-Mymensingh, PGCB. On going January, 2020.
17. Bhola O&M Division-2, BWDB, Charfesson, Bhola Survey of Meghna river for determining rivers bed Level in the Polder No.: 56/57 in connection with “Protection of different important bazar, Pourasava, Town and Polder embankment from the Erosion of Meghna River in Bhola District” during the year 2019-20 (Packae No.: Poura-Char-01/2019-2020). Completed January to June, 2020.
18. Sirajgonj O&M Division, BWDB, Sirajgonj. Bathymetric Survey in the Jamuna river in connection Sirajgonj Hard point monitoring during monsoon’2020 (July to October’ 2020) during the year 2020-21. Completed July to October, 2020.
19. Hobigonj O&M Division, BWDB, Hobigonj. Bathymetric survey of Kushiara river from Km 0.000 to 5.000 & Dhaleshwari river from Km 0.000 to Km 15.100 Total 20.100 at Upazilla Nabiganj & lakhai Dist. Habiganj under NDR budget under Habiganj O&M Division BWDB Habiganj during the year 2020-2021 Completed November, 2020.
20. Elite Trading Ltd., Dilkusha, Dhaka. Bathymetric Survey work in the Tentulia rivers in connection with dredging volume calculation & progress monitoring work. Completed January to December, 2020.